EV charger installers, Swindon

Charge at home. Overnight. Off-peak. Fitted properly.

Smart chargers fitted after we check your earthing and main fuse, with the paperwork done.

Step one: four photos

Get a fixed priceReplies in one working day

Through the letterbox

Five flyers on the mat, and still no charger.

Made-up flyers; the pen notes are what people tell us happened next. Example

  1. 1 Home chargers

    Fitted by lunchtime

    In and out in a morning.

    Written on it: It was. Nobody mentioned earthing, or the forms.

  2. 2 Book online

    No survey needed

    Just send your address.

    Written on it: One look at our fuse board and he left.

  3. 3 Every make

    Any wall, any car

    We fit them all.

    Written on it: No drive. A lead across the pavement, really?

  4. 4 Homeowners

    Own your home? Go electric

    A charger for every house.

    Written on it: We rent a flat. Can we even have one?

  5. 5 Smart chargers

    Plug in and go

    Charge whenever you like.

    Written on it: Will it charge when power is cheap, or trip the house?

Six drives near Swindon

Each one answers a flyer.

Where each charger went and how the cable reached it; each bar is an Example night.

Services

The charger is the small part of the job.

Most of it is out of sight: the earthing, the cable run, the main fuse and the forms.

01Home chargers A smart 7.4 kW charger by the drive or in the garage.Ends: The lead across the pavement Tethered or socket

On the wall by your drive, not across the path.

We survey, fit, test and set the app to charge off-peak. You plug in that evening.

01Home chargers

Drive, garage or wall

A home charger on a garage wall
02Earthing and load PEN fault protection and a clamp that keeps the main fuse safe.Ends: The fuse board turn-away Every fit

The part you never see, done to the regulations.

Outdoor chargers on a PME supply need PEN fault protection: PEN fault detection in the charger, or an earth rod where the ground suits.

02Earthing and load

Last year's fits that needed an earth rod

21%

The rest used the charger's own PEN fault detection.

On all 460 fits in 2025

A tidy hall cupboard: the electricity meter and a new consumer unit with its cover closed
03Flats and rentals A charger at your own bay, with the landlord's or freeholder's permission.Ends: Renting, so no charger Grant if eligible

Your own bay, your own meter.

You need your landlord's or freeholder's permission. If you qualify and the scheme is open, you apply online; once approved, we fit, claim the grant (75% of the cost, up to £500, per socket) and take it off your invoice.

03Flats and rentals

Government EV chargepoint grant

A charger beside a marked parking bay behind a block of flats
04Workplaces Twin 22 kW posts on a three-phase supply, sharing the load.Ends: A trip at teatime 310 sockets

Four sockets on one supply, nobody tripped.

A load study first, then posts that share what the building can spare.

04Workplaces

310 sockets since 2020

Twin charging posts in a small business car park
05Servicing A test, a fault found, or your charger moved to the new house.Ends: Fitted by lunchtime, never checked Sample: from £95

Tested, cleaned, set right again.

RCD and earth checks, firmware, the off-peak schedule. Or we lift it and refit it at your new address.

05Servicing and moves

From £95 (sample)

A serviced wall charger with its cover on, the installation tester resting in its open case on the step below

Example night

Plugged in at 23:10. Full by 05:40.

By default it charges outside the weekday peaks (8am to 11am, 4pm to 10pm), after a short random delay.

You can change it
Other times, in the app
When the house is busy
A meter clamp turns the charger down
A 24-hour dial of an Example night: the weekday peaks of 8am to 11am and 4pm to 10pm shaded, the car plugged in at 23:10, a short random delay, then charging until it is full at 05:40. 00 06 12 18 In 23:10 Full 05:40
  • Weekday peak
  • Short random delay
  • Charging
Example night, 7.4 kW: full before 6.30am, depending on the car and its battery.

Pricing

Paid
When it works
Deposit
None on home fits

Fixed before we drill a single hole.

VAT, charger, cable run and paperwork included; any grant comes off the invoice.

Sample prices, VAT included. Ask us something

  • Charger
  • Cable run included
  • Earthing
  • Load management
  • DNO notice and certificates
  • Groundwork
  • App and off-peak set-up
  • Time on site

Driveway

£975 / fitted

A wall charger by the drive, a short run from the board.

  • Charger7.4 kW smart, tethered or socket
  • Cable runUp to 10 m on the wall
  • EarthingPEN detection in the charger
  • Load management
  • DNO notice and certificates
  • GroundworkNot needed
  • App and off-peak
  • Time on siteAbout 4.5 hours
Book a driveway fit

Long run

Garages and lofts

£1,340 / fitted

For a charger further from the board.

  • Charger7.4 kW smart, tethered or socket
  • Cable runUp to 25 m through a loft or garage or under a path. Up to 5 m of ducting.
  • EarthingDetection or an earth rod
  • Load management
  • DNO notice and certificates
  • GroundworkUp to 5 m of ducting
  • App and off-peak
  • Time on siteAbout 7 hours
Book a long-run fit

Process

A reply
Within one working day

Four photos. Then a price.

The fuse board, meter, wall and drive, from your phone.

Which job is yours?

Home charger

5 to 10 working days from photos to fit. Example schedule:

  1. 01 Photos

    Photos, Monday of week 1

    A visit only if the board or the route needs one.

    You: send the four photos.

  2. 02 Price

    Price, Tuesday of week 1

    Most fixed prices are back the next working day.

    You: say yes, or ask us anything.

  3. 03 Fit

    Fit, Tuesday of week 2, 8am

    A standard home fit averages 4.5 hours.

    You: let us in. Power off once, for about 40 minutes.

  4. 04 Test

    Test, Tuesday of week 2, 12 noon

    We check the earthing and the charger settings.

    You: ask us to explain the checks.

  5. 05 Hand over

    Handover, Tuesday of week 2, 12.30pm

    The app set to off-peak, the certificates in your hand.

    You: plug in and pay once it works.

One home chargerExample scheduleFrom photos to plugging in

Not sure your supply can take a charger? Kerry reads every set of photos.

Kerry Vance

Bookings and grants

Book a survey

Photos first, a visit if needed

Why Ampwick

Sample figures

Our work in figures.

Our own electricians, fitting chargers since 2019.

Installs

2,140 Home fits

Home chargers fitted since 2019, each one certified.

On price

97 %

Invoices that matched the quote, to the pound.

Time on site

4.5 hours

Average for a standard home fit, power off for about 40 minutes.

Word of mouth

44 %

Of 2025's jobs came through a neighbour or a past customer.

Start with four photos

Your fuse board, your meter, the wall, the drive.

The four survey photos laid out: fuse board, meter, the wall and the drive
Send photos for a price

Most prices back in one working day

What you get on paper

Paperwork for home fits

6 Documents with a home fit, including the grant claim where eligible.

Your electrician signs the Electrical Installation Certificate and commissioning record.

DocumentWho issues itWhat it provesDays after
Electrical Installation Certificate Your electrician The new circuit meets BS 7671 On the day 0
Commissioning record Your electrician Earthing, load limit and smart settings as we left them On the day 0
Building regulations notice The competent person scheme The work is registered with the council Within 30 days
Network operator notice Ampwick, to your DNO Notified after most fits; we apply first and wait if the load exceeds the supply Within 28 days
Grant claim, where eligible Ampwick, to OZEV The grant comes off your invoice Where eligible
Warranty registration The charger's maker, through us The unit's warranty is in your name Within 7 days

Every certificate kept ten years; a copy the same day.

Ask for a copy

Schemes and cover: the client fills these in

  • Competent person scheme Your registration here
  • OZEV authorised installer Your installer number
  • TrustMark Your licence here
  • Charger maker approval Your approvals here
  • Public liability Your insurer and cover

From the driveways

On the drive

A new wall charger on a house beside a block-paved drive
Example review
"They found the old cable the builder left was too thin before anything went on the wall. Glad someone looked."
Came in with
A cable the builder left 'for a charger'
Went home with
A new cable, sized right, before anything went up
Hannah P. Royal Wootton Bassett
A tethered charger on a garage wall beside a workbench
Example review
"Joe explained the earth rod with a biro on the back of an envelope. Four hours later the car was charging."
Came in with
Two quotes that never mentioned earthing
Went home with
An earth rod, explained on an envelope
Graham M. Wroughton
A charger on a low brick wall at a parking bay behind a block of flats
Example review
"Kerry sorted the freeholder and the grant. I just had to be in for the morning they fitted it."
Came in with
A rented flat and a freeholder to ask
Went home with
A charger at her own bay, the grant off the bill
Sade A. Swindon town centre

Questions

Joe Marchant

Founder, electrician since 2009

Ring Joe

Fuses, earths and grants, answered.

Yours missing? Ring Joe, who has fitted most of our home chargers.

Will my main fuse cope with a charger?

Usually. A 7.4 kW charger draws 32 amps; most main fuses are 60, 80 or 100 amps. A meter clamp turns the charger down when the house is busy. A fuse too small is upgraded by the network operator, often free when needed for a charger.

What is PEN fault protection?

Most UK homes share neutral and earth in one conductor (PME). If it breaks, a car outside could become live. A charger that detects it, or an earth rod, protects you; the survey says which.

Can I get a grant?

For renters and flat owners with their own off-street parking. You need your landlord's or freeholder's permission. If you qualify and the scheme is open, the grant pays 75% of the cost, up to £500, per socket from 1 April 2026. Most owners of houses are not eligible. You apply online for the grant; once it is approved we fit the charger, claim the grant and take it off your invoice.

Why does the charger have to be smart?

The Smart Charge Points Regulations require it for chargers sold in Great Britain. By default it charges outside the morning and evening peaks, after a short random delay; you can change the times in the app.

Do you tell the network operator?

Yes: for most home chargers within 28 days of fitting. If the load is more than the supply was designed for, we apply first and wait. You never fill in the forms.

Tethered lead or a socket?

Tethered keeps its lead attached; a socket is neater and uses your car's own cable. Both charge at the same speed.

Do I need planning permission?

Usually not: a charger on a house wall or a post on your own drive is permitted development. Listed buildings, conservation areas and flats can differ; we check on the survey.

Can the cable cross the pavement?

Not with us: a lead across a public footway is a trip hazard. Some councils trial pavement channels; ask yours.